Cooling Water System Project

This EPC project is located in the Midland Refinery at Daura – Iraq, with a production capacity of 10,000 m3/hour of cooled and clarified water; this project targets reducing the river water temperature from 46° to 32° providing sufficient cooling for the refinery usage. This project includes engineering, procurement, supply of all equipment and materials, construction, erection, supervision of civil works, pre-commissioning, commissioning and test run activities with specific training for the refinery personnel. The plant process begins with a river water intake station which includes vertical pumps installed on a floating barge, clarifiers, water storage basins, induced draft cooling towers, chemical injection system with a booster, makeup, main circulation pumps, complete firefighting system, gravity side filters and all the piping network with a complete DCS.